Tower demolition construction method
Author:
Carry out safety planning, compile safety assurance plans, comply with existing regulations, and meet the relevant safety rules issued by the ministry; Formulate on-site safety, labor protection, civilized construction and environmental protection measures, and prepare temporary electricity consumption plans;
First, the construction preparation stage
1. Carry out safety planning, compile safety assurance plans, comply with existing regulations, and meet the relevant safety rules issued by the ministry;
2. Formulate on-site safety, labor protection, civilized construction and environmental protection measures, and prepare temporary electricity consumption plans;
3. Take corresponding protective measures in the construction area and the area affected by it;
4. Implement the safety measures of machinery and equipment, equipment and protective equipment during construction;
5. The demolition worker holds a certificate to work;
6. Gas cutters hold certificates to work;
7. Maintain the electrician with a certificate to work;
8. The shelf worker holds a certificate to work;
9. Relevant safety rules of relevant construction personnel shall be submitted to the bottom before construction.
Related News
undefined
Get Update From Newsletter
Contact Us
ADD: Room 12A06,HengYi Building,No.1116,BeiHuanXi Rd, Hongtang, JiangBei,Ningbo, Zhejiang, China 315000
TEL: +86-13858268513
E-mail: chengzhao@nbchengzhao.com
julie@nbchengzhao.com






Copyright © 2022 Ningbo Chengzhao International Trade Co., Ltd. All rights reserved. Powered by www.300.cn SEO Business licence